Latest News
Using electric vehicles (EV) have the potential to greatly decrease local greenhouse gas emissions, particulate matter, and other harmful pollutants resulting from gasoline vehicles. Switching to an electric vehicle has the potential to benefit air quality and save money from reduced fuel costs.
There are 200 level II EV stations available for use in Lot 3, with several more stations planned for other parking lots on campus as part of upcoming capital improvement projects over the next year and beyond.聽 This number of EV spaces is more than double that of any other 好色先生 campus, demonstrating CSUDH's unique commitment to carbon reduction and clean transportation.聽
Effective September 2, 2026 (Lot 3 EV Project Completion):
Pay for your charge on the Chargie app and use your @csudh.edu or @toromail.csudh.edu address to receive the campus-preferred rate of $0.35/kWh.
Plug-in the vehicle, scan the QR code on the charging station, and start charging from the app!
If you create the account using your CSUDH e-mail address, the discount will be applied immediately. If you check your charging session, you'll see that you will be charging at $0.35/kWh instead of $0.45/kWh.聽
The pre-authorization charge can be avoided when the user has a balance on their account.聽 So:
1) Make sure to start off with a balance by adding funds to your account shortly after establishing it and
2) Set up Auto-Reload which replenishes the account when you drop to $0.00.
As with any pre-authorization charge, this is dependent on your banking/credit card institution but usually 1-3 days.聽
If there is no posted signage restricting the space to "EV only" or otherwise, then it is considered general parking that also offer EV charging. This means:
-Gas vehicles can still park in these spaces
-EV drivers can choose to charge, but it is not required
Think of these as regular parking spaces with optional charging available.
If you have any issues with the station, charging, your account, etc. just let the 24/7 customer service team at Chargie know via the live support chat or e-mail in the app. If your issue is station related, be sure to mention the station number (posted on the charging unit) in your request.聽 聽
Lot 3 was selected because it is near a high-capacity electrical connection from Southern California Edison (SCE), which is required to support a large number of EV chargers. Most areas within campus do not have sufficient electrical capacity for this scale of infrastructure.
Additionally, many of the other possible parking lots were already designated for future construction projects. As a result, Lot 3 was the only location that met both the technical requirements and eligibility criteria for SCE鈥檚 program, which is funding the majority of this project.
The 10 existing chargers across campus will be decommissioned on Friday, September 4th 2026 while waiting to be upgraded with Chargie units over the course of spring 2027 and/or will be removed as follows:
-6 stations in northwest corner of Lot 3 to be removed.
-1 station next to the Library/LCH loading to be removed.
-2 stations in Lot 2 (will be replaced with 4 chargers).
-1 station at Physical Plant (will be replaced with 2 chargers).
-4 new chargers to be installed in Lot 1.聽
This ensures a consistent user experience, pricing, and policies across campus. Additional EV chargers may be added in other lots as part of future campus projects.
No. While the project adds a large number of EV-enabled spaces, only a small portion (primarily the second-most western row) will eventually be designated as EV-only with time limits.
Most spaces will remain general parking that also offer EV charging. This means:
-Gas vehicles can still park in these spaces
-EV drivers can choose to charge, but it is not required
Think of these as regular parking spaces with optional charging available.
This project was completed at no cost to campus stateside funds.聽 The infrastructure and most equipment costs were covered by Southern California Edison鈥檚 program.聽 Any remaining costs were paid using external energy rebate funds鈥攏ot tuition or state funds.
To access the discounted campus rate, you鈥檒l need to create a new Chargie account using your CSUDH email address.
If you have an existing balance, you can contact Chargie customer support to transfer your funds to the new account.聽
CSU policy requires that cost for utilities like electricity be recovered (), and providing free charging at this scale would not be financially sustainable or responsible.
The pricing is designed to strike a balance and:
Cover the cost of electricity
Offset transaction fees
Build a small reserve for maintenance, replacement, repairs, and vandalism
The campus is not using EV charging as a profit-generating program. Any funds collected are reinvested into maintaining the system and supporting clean transportation/greenhouse gas-reducing initiatives.
Rates are intentionally set to balance affordability for the CSUDH community and our visitors with cost recovery.聽 Setting excessive profit-driven rates would place an unnecessary burden on our students, employees, and visitors which would conflict with the goal of offering accessible, clean, lower-carbon transportation options on campus.聽
It is also critical that any revenue generated continues to support the charging system itself. EV infrastructure has ongoing and often unpredictable costs: equipment failures, costly damage from vandalism or accidents, software, state/county inspections, repairs, and long-term replacement. Keeping funds dedicated to the system ensures it can be reliably maintained without creating future budget shortfalls or shifting costs back onto the broader campus community.
Any funds collected beyond what is needed to operate and maintain the system are reinvested into expanding and advancing clean transportation and emissions-reduction efforts. This approach ensures every dollar directly improves campus services鈥攌eeping charging reliable, preventing future cost burdens, and advancing practical progress toward CSUDH鈥檚 carbon neutrality goals.
Yes.聽 Visitors are welcome to use the charging stations.聽聽 However, standard parking rules still apply (including the need for a valid parking permit at all times), and visitors will pay a slightly higher鈥攂ut still competitive鈥攔ate than campus-affiliated users.
The system is live and ready to use as of September 2, 2026.聽聽
You may contact sustainability@csudh.edu who will be able to address it directly and/or route it to the appropriate campus partner to address your inquiry.聽聽